{Previously posted in LinkedIn group I created: Pre-Engineered manufactured structural Building products, and have since shut down. It having a membership of 30 people. Most of these people also in my group Pre-Engineered Manufactured Building Systems Group which has over 2000 members.}
Projects suitable for final year civil engineering students. Projects typically occur in latter half of the year, but need preparing near the beginning of the year.
Past projects involved:
1) Testing of SIP's
2) Testing moment knee connections cold-formed steel construction
3) Testing extruded plaster panels
Student projects were supervised by Professor Julie Mills: